{"id":6145,"date":"2024-10-28T14:07:31","date_gmt":"2024-10-28T13:07:31","guid":{"rendered":"https:\/\/gridexpo.distinctive.de\/technology-requirements-for-the-electricity-grid-by-2045\/"},"modified":"2025-01-22T16:26:41","modified_gmt":"2025-01-22T15:26:41","slug":"technology-requirements-for-the-electricity-grid-by-2045","status":"publish","type":"post","link":"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/","title":{"rendered":"Technology requirements for the electricity grid by 2045"},"content":{"rendered":"<p><strong>By 2045, Germany\u2019s electricity grid will require more than 500,000 kilometers of cable and approximately 500,000 transformers to meet growing demands. This is the key finding of a demand study conducted by the University of Wuppertal on behalf of the German Association of Energy and Water Industries (BDEW) and the German Electrical and Electronic Manufacturers\u2019 Association (ZVEI). <\/strong><\/p>\n<p>The integration of renewable energy systems, storage facilities, heat pumps, data centers, and charging stations will necessitate significant expansion, reinforcement, and renewal of Germany\u2019s electricity grid. In addition to investments in capital and skilled labor, substantial amounts of technology, including cables and transformers, will be required to support this transformation.<\/p>\n<p>The study reveals that the distribution grid will account for 50 to 80 percent of the overall equipment demand, including:<br \/>\n\u2022 Low-Voltage Cables: Over 500,000 kilometers of new installations needed.<br \/>\n\u2022 Transformers: Approximately 500,000 units for medium-to-low voltage switching, representing nearly 80 percent of the current stock.<br \/>\n\u2022 High-to-Medium Voltage Transformers: Over 5,000 units must be installed, upgraded, or replaced\u2014roughly 70 percent of the existing stock.<\/p>\n<p>Reasons for the high demand:<\/p>\n<p>On the one hand, many grid components have reached the end of their service life and need to be replaced, on the other hand, the green transformation, increasing electrification and the growing share of renewable energies are placing ever greater demands on the electricity grid. \u201cThe electricity grid needs to be restructured now, with sufficient transport capacities and efficient utilization through digitalization in order to guarantee a secure power supply at all times,\u201d say BDEW and ZVEI. This requires high levels of investment and binding, constructive cooperation between all parties involved.<\/p>\n<p><a href=\"http:\/\/www.bdew.de\"><strong>www.bdew.de<\/strong><\/a><\/p>\n<p><a href=\"http:\/\/www.zvei.org\"><strong>www.zvei.org<\/strong><\/a><\/p>\n<p>Source: <a _blank=\"\" href=\"https:\/\/www.50komma2.de\/\" title=\"50,2 Magazin f\u00fcr intelligente Stromnetze\" rel=\"noopener\" target:=\"\">50,2 Magazine for smart grids<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By 2045, Germany\u2019s electricity grid will require more than 500,000 kilometers of cable and approximately 500,000 transformers to meet growing demands. This is the key finding of a demand study conducted by the University of Wuppertal on behalf of the German Association of Energy and Water Industries (BDEW) and the German Electrical and Electronic Manufacturers\u2019 [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[54],"tags":[],"class_list":["post-6145","post","type-post","status-publish","format-standard","hentry","category-general"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Technology requirements for the electricity grid by 2045 - GRIDexpo<\/title>\n<meta name=\"robots\" content=\"noindex, follow\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Technology requirements for the electricity grid by 2045 - GRIDexpo\" \/>\n<meta property=\"og:description\" content=\"By 2045, Germany\u2019s electricity grid will require more than 500,000 kilometers of cable and approximately 500,000 transformers to meet growing demands. This is the key finding of a demand study conducted by the University of Wuppertal on behalf of the German Association of Energy and Water Industries (BDEW) and the German Electrical and Electronic Manufacturers\u2019 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/\" \/>\n<meta property=\"og:site_name\" content=\"GRIDexpo\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-28T13:07:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-22T15:26:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/gridexpo.distinctive.de\/wp-content\/uploads\/2024\/10\/gridexpo-teaser-3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"570\" \/>\n\t<meta property=\"og:image:height\" content=\"570\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Annika Wolf\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/\"},\"author\":{\"name\":\"Annika Wolf\",\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/#\/schema\/person\/e7853171a57f36089f13ba6c19af683c\"},\"headline\":\"Technology requirements for the electricity grid by 2045\",\"datePublished\":\"2024-10-28T13:07:31+00:00\",\"dateModified\":\"2025-01-22T15:26:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/\"},\"wordCount\":277,\"publisher\":{\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/#organization\"},\"articleSection\":[\"General\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/\",\"url\":\"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/\",\"name\":\"Technology requirements for the electricity grid by 2045 - GRIDexpo\",\"isPartOf\":{\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/#website\"},\"datePublished\":\"2024-10-28T13:07:31+00:00\",\"dateModified\":\"2025-01-22T15:26:41+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\/\/gridexpo.distinctive.de\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Technology requirements for the electricity grid by 2045\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/#website\",\"url\":\"https:\/\/gridexpo.distinctive.de\/en\/\",\"name\":\"GRIDexpo\",\"description\":\"Internationale Fachmesse f\u00fcr intelligente Stromnetze\",\"publisher\":{\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/gridexpo.distinctive.de\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/#organization\",\"name\":\"GRIDexpo \u2013 Internationale Fachmesse f\u00fcr intelligente Stromnetze\",\"url\":\"https:\/\/gridexpo.distinctive.de\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/gridexpo.distinctive.de\/wp-content\/uploads\/2024\/10\/gridexpo-teaser-3.jpg\",\"contentUrl\":\"https:\/\/gridexpo.distinctive.de\/wp-content\/uploads\/2024\/10\/gridexpo-teaser-3.jpg\",\"width\":570,\"height\":570,\"caption\":\"GRIDexpo \u2013 Internationale Fachmesse f\u00fcr intelligente Stromnetze\"},\"image\":{\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/de.linkedin.com\/showcase\/gridexpo\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/gridexpo.distinctive.de\/en\/#\/schema\/person\/e7853171a57f36089f13ba6c19af683c\",\"name\":\"Annika Wolf\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Technology requirements for the electricity grid by 2045 - GRIDexpo","robots":{"index":"noindex","follow":"follow"},"og_locale":"en_US","og_type":"article","og_title":"Technology requirements for the electricity grid by 2045 - GRIDexpo","og_description":"By 2045, Germany\u2019s electricity grid will require more than 500,000 kilometers of cable and approximately 500,000 transformers to meet growing demands. This is the key finding of a demand study conducted by the University of Wuppertal on behalf of the German Association of Energy and Water Industries (BDEW) and the German Electrical and Electronic Manufacturers\u2019 [&hellip;]","og_url":"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/","og_site_name":"GRIDexpo","article_published_time":"2024-10-28T13:07:31+00:00","article_modified_time":"2025-01-22T15:26:41+00:00","og_image":[{"width":570,"height":570,"url":"https:\/\/gridexpo.distinctive.de\/wp-content\/uploads\/2024\/10\/gridexpo-teaser-3.jpg","type":"image\/jpeg"}],"author":"Annika Wolf","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/#article","isPartOf":{"@id":"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/"},"author":{"name":"Annika Wolf","@id":"https:\/\/gridexpo.distinctive.de\/en\/#\/schema\/person\/e7853171a57f36089f13ba6c19af683c"},"headline":"Technology requirements for the electricity grid by 2045","datePublished":"2024-10-28T13:07:31+00:00","dateModified":"2025-01-22T15:26:41+00:00","mainEntityOfPage":{"@id":"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/"},"wordCount":277,"publisher":{"@id":"https:\/\/gridexpo.distinctive.de\/en\/#organization"},"articleSection":["General"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/","url":"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/","name":"Technology requirements for the electricity grid by 2045 - GRIDexpo","isPartOf":{"@id":"https:\/\/gridexpo.distinctive.de\/en\/#website"},"datePublished":"2024-10-28T13:07:31+00:00","dateModified":"2025-01-22T15:26:41+00:00","breadcrumb":{"@id":"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/gridexpo.distinctive.de\/en\/technology-requirements-for-the-electricity-grid-by-2045\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/gridexpo.distinctive.de\/en\/"},{"@type":"ListItem","position":2,"name":"Technology requirements for the electricity grid by 2045"}]},{"@type":"WebSite","@id":"https:\/\/gridexpo.distinctive.de\/en\/#website","url":"https:\/\/gridexpo.distinctive.de\/en\/","name":"GRIDexpo","description":"Internationale Fachmesse f\u00fcr intelligente Stromnetze","publisher":{"@id":"https:\/\/gridexpo.distinctive.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gridexpo.distinctive.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/gridexpo.distinctive.de\/en\/#organization","name":"GRIDexpo \u2013 Internationale Fachmesse f\u00fcr intelligente Stromnetze","url":"https:\/\/gridexpo.distinctive.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gridexpo.distinctive.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/gridexpo.distinctive.de\/wp-content\/uploads\/2024\/10\/gridexpo-teaser-3.jpg","contentUrl":"https:\/\/gridexpo.distinctive.de\/wp-content\/uploads\/2024\/10\/gridexpo-teaser-3.jpg","width":570,"height":570,"caption":"GRIDexpo \u2013 Internationale Fachmesse f\u00fcr intelligente Stromnetze"},"image":{"@id":"https:\/\/gridexpo.distinctive.de\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/de.linkedin.com\/showcase\/gridexpo\/"]},{"@type":"Person","@id":"https:\/\/gridexpo.distinctive.de\/en\/#\/schema\/person\/e7853171a57f36089f13ba6c19af683c","name":"Annika Wolf"}]}},"_links":{"self":[{"href":"https:\/\/gridexpo.distinctive.de\/en\/wp-json\/wp\/v2\/posts\/6145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gridexpo.distinctive.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gridexpo.distinctive.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gridexpo.distinctive.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/gridexpo.distinctive.de\/en\/wp-json\/wp\/v2\/comments?post=6145"}],"version-history":[{"count":1,"href":"https:\/\/gridexpo.distinctive.de\/en\/wp-json\/wp\/v2\/posts\/6145\/revisions"}],"predecessor-version":[{"id":6165,"href":"https:\/\/gridexpo.distinctive.de\/en\/wp-json\/wp\/v2\/posts\/6145\/revisions\/6165"}],"wp:attachment":[{"href":"https:\/\/gridexpo.distinctive.de\/en\/wp-json\/wp\/v2\/media?parent=6145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gridexpo.distinctive.de\/en\/wp-json\/wp\/v2\/categories?post=6145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gridexpo.distinctive.de\/en\/wp-json\/wp\/v2\/tags?post=6145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}